Most recent applications from NSW Sydney and Regional Planning Panels, NSW

20 Melwood Avenue Forestville 2087,22 Melwood Avenue Forestville 2087,24 Melwood Avenue Forestville 2087, NSW

Two (2) staged redevelopment of the Forestville RSL club involving the construction of a registered club and fifty five (55) independent living units and ancillary uses

25 days ago

80 Betty Cuthbert Drive Lidcombe 2141, NSW

Subdivision of existing lot into 3 Torrens Title lots.

29 days ago

41-45 President Avenue Caringbah, NSW

Modification Application to DA19/0333 - Amendment to conditions 53, 62 and 64.

29 days ago

465 Princes Highway Rockdale 2216,469 Princes Highway Rockdale 2216,5-7 Geeves Avenue Rockdale 2216, NSW

Integrated Development - Demolition of existing structures and construction of a twelve-storey shop top housing development consisting of two commercial tenancies at ground floor level with residential co-living above, basement car parking and landscaping

29 days ago

12 Commercial Road Alstonville 2477, NSW

Construction of a two storey medical centre, with ground floor car parking, associated infrastructure works and landscaping works and a new business identification sign

30 days ago

1419 Peats Ridge Road Peats Ridge 2250, NSW

Construction and operation of greenhouse for intensive plant agriculture - horticulture and landfilling of site.

30 days ago

1 Hutton Road The Entrance North 2261,3-7 Hutton Road The Entrance North 2261,9 Hutton Road The Entrance North 2261, NSW

Coastal protection works and management of contaminated land.

30 days ago

171 Weston Street Panania 2213,2 Hinemoa Street Panania 2213,4 Hinemoa Street Panania 2213,6 Hinemoa Street Panania 2213, NSW

Demolition of existing structures and construction of a 4-5 storey affordable housing residential flat building comprising 42 apartments, over basement carparking.

About 1 month ago

1848 Castlereagh Highway Tallawang 2852,Castlereagh Highway Tallawang 2852, NSW

Proposed hard rock quarry pit with an extraction rate of 350,000 tonnes per annum.

About 1 month ago

Apiary Street Austral 2179, NSW

Constructing a modern child care facility with 136 places, 23 teachers, and parking for 41 vehicles in a basement at Lot 35, No. 255 Seventh Avenue, Austral.

About 1 month ago

263-281 Pennant Hills Road Carlingford 2118, NSW

2
comments

Addition of 16, 18 and 18 storeys respectively (additional 301 units) to Buildings A, B and C along Pennant Hills Road to the existing approved mixed use development consent DA/53/2022.

About 1 month ago

Heathcote Road Pleasure Point 2172,Pleasure Point Road Pleasure Point 2172, NSW

The general arrangement of roads, identification of land for public open spaces, establishment of environmental corridors, and stormwater infrastructure on both lots; and Stage 1 works comprising a residential subdivision of approximately 380 lots over 7 substages, including the construction of internal roads and dedication and embellishment of the environmental corridor on part of Lot 1 DP 875804, and stormwater infrastructure for stage 1 on Lot 2 DP817692. Works also include the upgrade to Pleasure Point Road and the intersection with Heathcote Road including reconstruction of suburb entry statement, a new site entry, and construction of new pedestrian and cycle connections within the site and adjoining the land.

About 1 month ago

Pepper Close Hunterview 2330, NSW

Proposed 88 lot subdivision over 7 stages. Including ancillary works

About 1 month ago

250 Boorooma Street Charles Sturt University 2678, NSW

Centre based childcare facility with new access to Farrer Road and two lot subdivision

About 1 month ago

361 Spinks Road Glossodia 2756, NSW

The staged subdivision of existing Lots 205 – 207 and 210 DP1268299 to create 256 Torrens Title Residential Lots. Civil works associated with the creation of the lots and delivery of supporting infrastructure. The provision of urban infrastructure to the proposed lots including reticulated water, reticulated recycled water, reticulated sewer, electricity, and telecommunications networks. New Public Roads and an intersection (round-a-bout) connecting to Spinks Road.

About 1 month ago

Ti-Tree Road Sandy Beach 2456,15 Pine Crescent Sandy Beach 2456,17 Pine Crescent Sandy Beach 2456, NSW

Subdivision (113 residential lots, 1 Biodiversity Stewardship Lot, dedication of reserves)

About 1 month ago

47 Swinbourne Street Banksmeadow 2019, NSW

1
comment

Demolition of existing structures and construction of a multi-storey food manufacturing facility, removal of twenty-two (22) trees, and associated site works and signage; operating 24 hours seven days

About 1 month ago

263-281 Pennant Hills Road Carlingford 2118, NSW

Mixed-use development comprising 2 residential flat buildings (12 & 15 storeys) and a new library and community facility (to be dedicated to Council), basement and landscaping. This application is integrated development under Section 90(2) of the Water Management Act 2000. This application will be determined by the Sydney Central City Planning Panel.

About 1 month ago

581 Luddenham Road Luddenham Nsw 2745, NSW

Upgrading of a 600m long section of Luddenham Road, new ‘interim’ signalised 'T-intersection', associated works and Torrens Title Subdivision of 3 Lots into 6 Lots to create 3 'Road Reserve' lots

About 1 month ago

6-18 John Street East Maitland 2323, NSW

Recreation Facility (indoor), Information and Education Facility, Food and Drink Premises, Function Centre, Ancillary Retail and Office Premises, Demolition, and Alterations and Additions to Existing Buildings

About 1 month ago

6-18 John Street East Maitland 2323, NSW

Alterations and Additions to Existing Buildings, Tourist and Visitor Accommodation

About 1 month ago

43 The Esplanade Ettalong Beach 2257,44 The Esplanade Ettalong Beach 2257,45 The Esplanade Ettalong Beach 2257,46 The Esplanade Ettalong Beach 2257, NSW

Construction of Shop Top Housing & Demolition of Existing Structures (Nominated Integrated)(RPP)

About 2 months ago

12 Links Road St Marys 2760, NSW

Construction of a Waste Management Facility

About 2 months ago

285 Aldington Road Kemps Creek 2178, NSW

Demolition of Existing Structures and Staged Construction of Two Warehouse and Distribution Buildings on the Westlink Site Lot 10, with Associated Works Including Parking, Landscaping, Civil Works, Retaining Works, and Stormwater Management Works

About 2 months ago

41 Duncan Street Arncliffe 2205,43 Duncan Street Arncliffe 2205,45 Duncan Street Arncliffe 2205,47 Duncan Street Arncliffe 2205,49 Duncan Street Arncliffe 2205,51 Duncan Street Arncliffe 2205, NSW

Integrated Development - Demolition of existing structures and construction of a 12 storey residential flat building with 94 units and 3 levels of basement parking

About 2 months ago

270 Keira Street Wollongong 2500,272 Keira Street Wollongong 2500,27 Kenny Street Wollongong 2500,29 Kenny Street Wollongong 2500, NSW

Demolition of existing structures, construction of a 6 and a 14 storey building comprising ground floor commercial and residential units above with basement parking.

About 2 months ago

Burragorang Road Orangeville 2570, NSW

Construction and operation of a 5MW photovoltaic solar farm, demolition of structures, battery energy storage system, and onsite infrastructure including cabling, internal access tracks, staff amenities, operations and maintenance store, water tanks and security fencing.

About 2 months ago

494 Wingham Road Taree 2430,524 Wingham Road Taree 2430, NSW

Master Plan Seniors Housing Development (207 Units Concept - 8 Stages) - Stage 1 only - Bulk Earthworks and 19 Units

About 2 months ago

18 Garrett Street Moss Vale 2577, NSW

Alterations and Additions to St Paul’s Catholic Primary School

About 2 months ago

1 Hazeldean Way Airds 2560,1 Tiverton Way Airds 2560,1 Willandra Way Airds 2560,10 Hazeldean Way Airds 2560,10 Willandra Way Airds 2560,11 Hazeldean Way Airds 2560,12 Hazeldean Way Airds 2560,12 Willandra Way Airds 2560,14 Willandra Way Airds 2560,16 Willandra Way Airds 2560,18 Willandra Way Airds 2560,2 Willandra Way Airds 2560,20 Willandra Way Airds 2560,22 Willandra Way Airds 2560,24 Willandra Way Airds 2560,3 Hazeldean Way Airds 2560,3 Tiverton Way Airds 2560,3 Willandra Way Airds 2560,4 Hazeldean Way Airds 2560,4 Tiverton Way Airds 2560,4 Willandra Way Airds 2560,43 Peppin Crescent Airds 2560,47 Peppin Crescent Airds 2560,5 Hazeldean Way Airds 2560,5 Tiverton Way Airds 2560,5 Willandra Way Airds 2560,53 Peppin Crescent Airds 2560,57 Peppin Crescent Airds 2560,59 Peppin Crescent Airds 2560,6 Hazeldean Way Airds 2560,6 Tiverton Way Airds 2560,6 Willandra Way Airds 2560,61 Peppin Crescent Airds 2560,63 Peppin Crescent Airds 2560,65 Peppin Crescent Airds 2560,67 Peppin Crescent Airds 2560,69 Peppin Crescent Airds 2560,7 Hazeldean Way Airds 2560,7 Tiverton Way Airds 2560,7 Willandra Way Airds 2560,71 Peppin Crescent Airds 2560,73 Peppin Crescent Airds 2560,75 Peppin Crescent Airds 2560,77 Peppin Crescent Airds 2560,79 Peppin Crescent Airds 2560,8 Hazeldean Way Airds 2560,8 Willandra Way Airds 2560,9 Hazeldean Way Airds 2560,Georges River Road Airds 2560,4 Mungadal Way Airds 2560,Peppin Crescent Airds 2560,34 Peppin Crescent Airds 2560,32 Peppin Crescent Airds 2560,30 Peppin Crescent Airds 2560,28 Peppin Crescent Airds 2560,Mungadal Way Airds 2560,94 Georges River Road Airds 2560, NSW

Airds Stage 5 - Subdivision into 108 residential lots, three (3) residue lots, one (1) lot for open space, land dedicated as roads and associated subdivision works including demolition, excavation works associated with road grading, site benching, removal of redundant services, the construction of roads and roadworks, stormwater drainage, utility services, selective tree removal, sedimentation control, and street landscaping

About 2 months ago